The Toronto Railway Museum is open! Please click here for more information.     
Click Here to
join the TRHA
discussion group.




Powered by Blogger

           
12/08/2007

Realigning the trackwork!



Click on each picture for a closer look!
.
.
.
.
This week we had to remove a 39 foot track panel from in front of the CLC Whitcomb to allow Steam Whistle Brewing to take delivery of several new beer tanks. Today, the TRHA's contractor re-installed the missing panel and re-lined the track with the turntable centre. The big loader equipped with forks made easy work of nudging the track into the right place. The white line is a measuring tape hooked over a pin placed in the centre of the turntable deck to serve as a centre line.
.
by Michael Guy, TRHA

News and Events About Us Museum Collections History Links Contact Us Resources Home